The key characteristics of a project include presence of well-defined purpose to mention the goal in terms of performance requirement, cost and schedule; well-defined scope, presence of adequate amount of required resource, effective time management, risk identification and quality working standard. Moreover, the other characteristics in project include implementation of unique ideas in achieving goals, presence of temporary activities, project cut across organisational lines, unfamiliarity and others (Castillo et al. 2018). For students seeking guidance, seeking management dissertation help can provide valuable insights into navigating these complexities effectively.

The integration management in project management is collective processes needed to ensure that different elements of the project are effectively coordinated. The importance of integration management is that it allows the leaders of the project perform audits and assessment along with optimising resources and processes that allows reducing time and eliminate complication in executing the project. Moreover, integration management enhances the performance within a project by eliminating redundancies and establishing effective consistency at work. In project management settings, integration management is essential as it facilitates effective decision-making to determine ideas to be used in executing the project (Ejel, 2018).

Whatsapp

Question 2

The scope statement in a project informs that key deliverables of a project involving the major milestones, assumptions, high-level requirements and constraints. It also mentions the boundaries and classifies the deliverable to be required in the project (Pheng, 2018). The key role of work breakdown structure (WBS) in this statement is to lower complicated activities in the project. This is because it provides precise and concrete information to the project team to understand which tasks are to be accomplished when and under which deliverable so that enhanced cost, time and risk management are ensured (Sutrisna et al. 2018).

Dig deeper into Time Management with our selection of articles.

Question 3

There are mainly two key approaches used in framing budget of a project which are top-down approach and bottom-up approach. In top-down approach, the senior management in the project frame a high-level budget for the accomplishment of the project plan. In this approach, after determining the top-level numbers the management distributes the amounts allocated to different departments for them to develop individual budget for accomplishing the project from their part (Kerzner, 2019). However, in bottom-up approach, the budgeting for the project initiates from individual departments where each manager of the department create a financial statement and send it to be approved to the senior management controlling the entire project (Stinnett-Donnelly et al. 2016).

Question 4

The four types of project management risks include scope, resource, schedule and technology risk. The scope risk involves with identification of scope of the project, schedule risk is related with time management issues, resource risk is related to complication of presence of materials in accomplishing the project and technology risk includes the issues with identifying and implementing software and electrical equipment (Qazi et al. 2016). In order to manage schedule risk in project management, estimation of its wide variety is to be made and project managers are required to provide enough allowance for holidays along with breakdown of all nature of tasks with high duration. This is because it would influence the workers as per the schedule and complete the work in time without experiencing higher workload which may intend them to quit and avoid following of schedule (Bañuls et al. 2017). The technology risk is to be resolved in project management by the project manager by determining defects of each equipment to be used and eliminating them prior to initiation of the project. Moreover, effective knowledge regarding the way to maintain secured operation of technology in project management is to be known by the managers and workers which they are to implement at work to avoid the security risk with technology (Ghasemi et al. 2018).

Question 5

In project management, the monitoring quality method is to be introduced by me to ensure the project is completed successfully. This is because monitoring assists to lead me as project manager know the how the indented results as planed are being achieved along with the changes in action required to ensure the determined goals of the project are successfully reached in the end. Moreover, monitoring would lead to understand perspective of stakeholders and the extent of accountability of the workers making the manager aware of the further process to be planned to ensure success of the project (Alaidaros and Omar, 2017).

Question 6

Tasks Precedence Time
Develop soundproof walls for controlling outside noise A 10-11 months
Remodelling 25 new workplaces in the building B 12-17 months
Installation of smart boards and interactive device C 18-22 months
Installation of project management software D 23-24 months

Gantt Chart

project gantt chart

Task 2

Project management is referred to the practice of leading a team at work to achieve goals and accomplish the success of specific criteria within specific time in a project (Meredith et al. 2017). In managing any project, the Project Life Cycle is to be followed to determine the systematic way in which work is to be managed for the success of the project. The project life cycle mentions five key stages to be followed which are initiation, planning, implementation, control and closing phase. In framing the current project, the project life cycle is to be followed so that a systematic approach can be taken in accomplishing the activities to ensure its success.

Project Name: Sun-Project 20X20

Project Initiation phase

In initiation phase, the aim and objectives of the project are identified. This is because it provides clarified information regarding the goals to be achieved and intention of executing the project (Newton, 2016). The feasibility study is performed in the phase to investigate the viability and justification of executing the project (Ma et al. 2018).

Project Aim:

The aim of the project is to refurbish the lecture and classroom at the University of Sunderland London Campus to the up-to-the-minute campus of learning.

Project Objectives:

  • To install 20 new workstations as learning space for students on second floor and 5 new workstations as job searching in the library
  • To fit the classroom and workspaces with latest smartboard and interactive devices for ensuring effective contemporary learning
  • To install Project Management software in all of the workstations
  • To manage noise problem in the work station created by DLR passing near the building

Feasibility Study:

The feasibility study regarding the project informs that it can be effectively accomplished as the project manager guiding the process has adequate knowledge and skills of ways to manage the budget for the project, allocate effective working team and arrange resources required. Moreover, during the execution of the project, no classes would be running making it an opportunity for the project manager to avoid barriers at work due to inappropriate intervention by students and others

Project Planning Phase

During the planning phase, the strategies required to be implemented in success of the project are developed by discussion with experts and clients (Papke-Shields and Boyer-Wright, 2017). This is essential so that detailed activities, dependencies, tasks and timeframes are known in executing the project successfully.

Scope Planning The scope planning is referred to the process in which the outcomes, outputs, and deliverables of the project are identified. This is important so that actions within the project can be prioritised in enhanced manner which in turn ensures saving money and time. The lack of scope planning leads to hindered identification and validation of actions to be performed in successfully accomplishing the project (Derenskaya, 2018) .
Planning actions for refurbishment Scope for the action
Installation of smart boards and interactive device It support up-to-the-minute campus learning experience
Controlling outside noise It helps to manage a clam and positive environment to support enhanced flow of information between students and teachers during learning without barriers of interruption from improper noises
Installation of project management software It allows the software to be used by project management students in learning the way to plan and accomplish a project
Refurbishing 25 new workplaces in the building It ensures innovative and supportive learning environment is provided to students that allows them enhanced learning
Resource Planning The resource planning is referred to process in which the human and non-human resources required to accomplish the tasks within a project are identified (Marier-Bienvenue et al. 2017). The lack of resource planning in project management creates hindrance at work as needed materials in accomplishing the activities of the projects are unavailable leading to waste time, energy and finances (Issa and Tu, 2017).
  • Electricians: The electricians are individuals with expertise in installing and maintaining electrical equipment (Tonchia, 2018). The individuals are required in the project as they would be involved in developing electrical wiring and circuit plans for the installation of smart boards and interactive devices in setting up the up-to-the-minute classroom.
  • Construction Workers: The construction workers are referred to individuals involved in the physical construction of any building (Leung et al. 2016). The role of construction workers in the project is to develop new constructions within the classroom by changing the old physical environment to ensure a supportive up-to-the-minute learning experience is effectively ensured. In addition, they are to be involved in developing soundproof walls in the workplace to control outside noise from entering the learning environment.
  • Software Engineers and Programmers: They are to be involved in the project as they would be responsible for developing and implementing the necessary software solutions for the smart classroom environment.
  • Carpenters: They are required to install desks, windows, and doors in the workplace to make it suitable to be used by the staff and students. Moreover, they are also going to work towards installing noise-proof doors and windows.
  • Additional and Supportive Staff: These staff members are essential for providing miscellaneous support to ensure the smooth execution of the project.

Physical Resource required in the project:

  • SmartBoard and projector
  • Microphones
  • Computer and laptops
  • Electrical wiring, switches and other electrical equipment
  • Soundproof wall materials and equipment
  • Standing desks and chairs
Communication Planning

The communication planning in project management informs the way valuable data are to be interacted with the external and internal stakeholders related to the project (Bütschi, 2018). The lack of effective communication planning leads to hindered sharing of ideas and tasks between workers, making them unable to ensure the smooth execution of the project. Further, lack of effective interaction with the external stakeholders leads the project manager unable to make enhanced decisions towards applying changes in the project as well as the managers unable to determine the aspects to be involved in the project for effective satisfaction of the stakeholders at the end of the project (Butt et al. 2016).

The online communication methods are to be used in the project for interaction with stakeholders. This is because it allows instant and timely exchange of messages through videos, voice and written format within facing any location barriers or need of physical presence of individuals (Yang et al. 2020). The communication methods to be used in the project includes:

  • Collaboration application
  • In-person meeting
  • Email
  • Video conferencing
Communication Method Frequency Goal Owner Audience
Status report of project Email Weekly To analyse project status and develop discussion regarding reason and management of problems and delays Project Manager Project team, project sponsors
Team stand up Video and in-person meeting Daily To discuss everyday work activities of members involved in the project and revision of their work done the other day along with determine the tasks to be done the next day at work. Project Manager Project team
Review of project In-person meeting At each milestone To examine the extent project deliverables are met, assess feedback and discuss further steps to be taken Project Manager Project team and sponsors
Post-monitoring meeting In-person-meeting End of project To analyse the aspects that worker and did not worked in the project and what actions are to be taken. Project Manager Project team
Client meeting Email and video conferencing Monthly To discuss the progress of the project and determine the nature of changes to be made further to accomplish the project as per their satisfaction Project Manager Clients
Task progress updates Team collaboration and interactive software Daily To share everyday progress of the tasks in the project Project Manager Project team
Risk Planning

In project management, risk planning is referred to the process of determining, prioritising and managing safety issues or risk (Urbański et al. 2019). The lack of risk planning leads to unplanned loss and damage of resources and properties during the project that in turn leads to additional cost along with delay in time and miss of deadline in executing the projects (Heagney, 2016). It collaboratively leads to dissatisfaction among clients and negative work environment.

The risks identified to be faced in the project are as follows:

  • The technical risks identified to be faced in the project are quality issue and performance of smart boards and interactive devices, hindered software performance and failure of appropriate installation of software devices.
  • The financial risk to be faced is unplanned expenditure, lack of credit, backup asset and hindered investment.
  • The security risks to be faced are software security risk in which malicious agents may damage the computers, lack of confidentiality of private information and malware attack.
  • The environmental risk includes fatal fall, improper ventilation, fire hazard, air pollution and natural disasters.
  • The fire safety risks include breakage of fire due to electric short circuit, presence flammable substances and others.
Quality Planning

The quality planning is referred to the documents that inform specific standards of practices and resources to be followed within the project for its effective and successful execution (Tallenti et al. 2019).

  • Smartboards to be wider than 300 cm with the ability to be used in dark rooms with high resolution clear from the back of the class
  • Interactive devices and smart boards are to be electric shock-proof
  • Hygiene and clean environment is to be maintained
  • Flammable and harmful substances are to be stored with installation of safety signs
  • Effective presence of firewall and antivirus software in the computers
  • Use of high end and secured passwords in managing details within software
Cost Planning

The cost planning is referred to development of budget for the project to demarcate the finances to be used in accomplishing different deliverables in the project (Idowu and Lam, 2019). The cost planning or budget in this project is to be developed in top-down approach in which the initial budget is to be framed by the senior project manager and the funds are to be accordingly distributed for each team or department involved in accomplishing the project.

Activities Cost required
Installation of smartboard and interactive devices £1.2 million
Installation of soundproof wall £2 million
Remodelling and construction of 25 workspaces £2.5 million
Installation of project management software £0.3 million
Electrical and computer equipment and devices £1.5 million
Fire safety installation £0.5 million
Time Planning

The deadline for the project deliverables are as follows:

Actions Deadline
Develop soundproof walls for controlling outside noise 10-11 months
Remodelling 25 new workplaces in the building 12-17 months
Installation of smart boards and interactive device 18-22 months
Installation of project management software 23-24 months

Table 1: Project Management Plan

Work Breakdown Structure

Work Breakdown Structure

Figure 1: Work break down the structure

Gantt Chart

project gantt chart

Implementation Phase

In implementation phase, the project plan is introduced and work activities are accordingly performed. During this phase, effective control and communication are required to ensure adjustments are accordingly made if needed for successful accomplishment of the project (Audzeyeva and Hudson, 2016). In this project, the project status report and weekly meeting with the employees by the project manager is made to determine the success of implementation of the project. This is because it allowed the project manager to determine progress or decline in the operation of activities to be accomplished for which the project plan is been developed.

Control Phase

The control phase in project management is the one in which monitoring of performance of the project and employees involved in the project are done. This is because it is going to inform the positive and negative aspects in the ongoing project along with aware project manager of the changes to be made so that unnecessary barriers do not hinder the progress of the project (Sunder, 2016). In order to monitor and control the implemented project plan, survey is to be performed by the project manager. In the survey technique, 75 employees who are working for the Sun-Project 20X20 are to be involved out of 150 total employees through probability sampling method. This is because it would help to select sample for assessment of project implementation who represent the whole population of workers in the project allowing generalisation of the results (Kivilä et al. 2017). The use of close-ended questionnaires is to be done for gathering information from the sample.

1. How far do you agree the project management plan for Sun-Project 20X20 is successfully implemented in framing an effective up-to-the-minute learning workspace in the University?

 project management plan

2. Do you think the smartboard and interactive devices are appropriately installed to support contemporary teaching?

 contemporary teaching

3. Which project management software is preferred to be installed?

project management software

4. Do you agree effective sound-proof walls are made to avoid noise problem in the classroom caused by DLR passing by the building?

 DLR passing

Discussion of Findings and Data

The survey to determine status report of implementation of the project plan informs that increased number of employees is supporting that the use of the plan is effectively made to ensure successful accomplishment of Sun-Project 20X20. This is evident as 36% of employees agree that the project management plan is effectively implemented to ensure developing the up-to-the-minute learning environment. Further, 26% strongly agree whereas only 16% disagree and 13% strongly disagree that the project management plan for Sun-Project 20X20 is not successfully implemented to frame the demanded nature of contemporary learning workspace in the university. This indicates that the project management plan is appropriately developed and effectively followed by the employees to ensure project success. The data reveals that 29% agree and 26% strongly agree that the determined project management plan is successful to implement sound-proof walls in the environment whereas only 20% disagreed to the fact. Thus, it indicates that the project manager is able to control noise intervention to be faced by the learning environment in the University out of DLR train commute by the side of the building

The gathered data also informs that 32% agree and 29% strongly agree that smart boards and interactive devices are effectively implemented at the workspaces in the University following the project management plan. However, only 13% strongly disagreed and 18% disagreed that the smart boards and interactive devices are still not effectively installed in supporting contemporary learning in the environment. Therefore, it informs that the project plan is appropriately implemented in meeting the objectives of setting a contemporary learning workspace in the university. The survey informs that 30% which is highest agree to install Basecamp as the project management software in the process for the students to be used later. This is an enhanced decision because it is one of the simplest project management tool to be used that allows integration of data from different third-party tools for synchronization and backup of data regarding the project (Herman, 2019).

Closing Phase

In closing phase of the project management, the emphasis is on calculating the efficiency of meeting the final deliverables to the customers, releasing project resources, making project documentation and announcing project closure (Meredith et al. 2017). In the current project, in the closing phase the project manager led the client review the entire refurbished environment to mention if any further changes are to be made. After this, the closure documentation is reviewed and signed by the client. The project manager then announced the closure of the project and developed documentation of the project to be stored for future use.

Take a deeper dive intoProcess Management in Construction with our additional resources.

Order Now

References

Part 1:

  • Alaidaros, H. and Omar, M., 2017. Software project management approaches for monitoring work-in-progress: A review. Journal of Engineering and Applied Sciences, 12(15), pp.3851-3857.
  • Bañuls, V.A., López, C., Turoff, M. and Tejedor, F., 2017. Predicting the impact of multiple risks on project performance: A scenario-based approach. Project Management Journal, 48(5), pp.95-114.
  • Castillo, T., Alarcon, L.F. and Pellicer, E., 2018. Influence of organizational characteristics on construction project performance using corporate social networks. Journal of Management in Engineering, 34(4), pp.1-9.
  • Ejel, A.T., 2018. Impact of Integration Management on Construction Project Management Performance (Oil Refining Company). International Journal of Engineering & Technology, 7(3.5), pp.40-42.
  • Ghasemi, F., Sari, M.H.M., Yousefi, V., Falsafi, R. and Tamošaitienė, J., 2018. Project portfolio risk identification and analysis, considering project risk interactions and using Bayesian networks. Sustainability, 10(5), p.1609.
  • Kerzner, H., 2019. Using the project management maturity model: strategic planning for project management. John Wiley & Sons.
  • Pheng, L.S., 2018. Project Scope Management. In Project Management for the Built Environment (pp. 63-77). Springer, Singapore.
  • Qazi, A., Quigley, J., Dickson, A. and Kirytopoulos, K., 2016. Project Complexity and Risk Management (ProCRiM): Towards modelling project complexity driven risk paths in construction projects. International journal of project management, 34(7), pp.1183-1198.
  • Stinnett-Donnelly, J.M., Stevens, P.G. and Hood, V.L., 2016. Developing a high value care programme from the bottom up: a programme of faculty-resident improvement projects targeting harmful or unnecessary care. BMJ Qual Saf, 25(11), pp.901-908.
  • Sutrisna, M., Ramanayaka, C.D. and Goulding, J.S., 2018. Developing work breakdown structure matrix for managing offsite construction projects. Architectural engineering and design management, 14(5), pp.381-397.

Part 2:

  • Audzeyeva, A. and Hudson, R., 2016. How to get the most from a business intelligence application during the post implementation phase? Deep structure transformation at a UK retail bank. European Journal of Information Systems, 25(1), pp.29-46.
  • Bütschi, G., 2018. Communication Planning. The International Encyclopedia of Strategic Communication, pp.1-11.
  • Butt, A., Naaranoja, M. and Savolainen, J., 2016. Project change stakeholder communication. International Journal of Project Management, 34(8), pp.1579-1595.
  • Derenskaya, Y., 2018. Project scope management process. Baltic Journal of Economic Studies, 4(1), pp.118-125.
  • Heagney, J., 2016. Fundamentals of project management. Amacom.
  • Herman, A., 2019. Project Management with Basecamp and Google Apps. Macalester.
  • Idowu, O.S. and Lam, K.C., 2019. Web-based application for predesign cost planning of vertical building envelopes. Automation in Construction, 106, p.102909.
  • Issa, S. and Tu, Y., 2017. Integrated multi-resource planning and scheduling in engineering project. Journal of Project Management, 2(1), pp.11-26.
  • Kivilä, J., Martinsuo, M. and Vuorinen, L., 2017. Sustainable project management through project control in infrastructure projects. International Journal of Project Management, 35(6), pp.1167-1183.
  • Leung, M.Y., Liang, Q. and Olomolaiye, P., 2016. Impact of job stressors and stress on the safety behavior and accidents of construction workers. Journal of Management in Engineering, 32(1), p.04015019.
  • cle project management. Journal of Management in Engineering, 34(6), p.05018011.Ma, X., Xiong, F., Olawumi, T.O., Dong, N. and Chan, A.P., 2018. Conceptual framework and roadmap approach for integrating BIM into lifecy
  • Marier-Bienvenue, T., Pellerin, R. and Cassivi, L., 2017. Project planning and control in social and solidarity economy organizations: a literature review. Procedia computer science, 121, pp.692-698.
  • Meredith, J.R., Mantel Jr, S.J. and Shafer, S.M., 2017. Project management: a managerial approach. John Wiley & Sons.
  • Newton, R., 2016. Project Management Step by Step: How to plan and manage a highly successful project. Pearson UK.
  • Papke-Shields, K.E. and Boyer-Wright, K.M., 2017. Strategic planning characteristics applied to project management. International Journal of Project Management, 35(2), pp.169-179.
  • Sunder M, V., 2016. Lean six sigma project management–a stakeholder management perspective. The TQM Journal, 28(1), pp.132-150.
  • Tallentire, V.R., Harley, C.A. and Watson, S., 2019. Quality planning for impactful improvement: a mixed methods review. BMJ open quality, 8(4), p.e000724.
  • Tonchia, S., 2018. Project time management. In Industrial project management (pp. 117-129). Springer, Berlin, Heidelberg.
  • Urbański, M., Haque, A.U. and Oino, I., 2019. The moderating role of risk management in project planning and project success: evidence from construction businesses of Pakistan and the UK. Engineering Management in Production and Services, 11(1), pp.23-35.
  • Yang, Y., Brosch, G., Yang, B. and Cadden, T., 2020. Dissemination and communication of lessons learned for a project-based business with the application of information technology: a case study with Siemens. Production Planning & Control, 31(4), pp.273-286.
Sitejabber
Google Review
Yell
What Makes Us Unique
  • 24/7 Customer Support
  • 100% Customer Satisfaction
  • No Privacy Violation
  • Quick Services
  • Subject Experts
Research Proposal Samples
Live Chat with Humans
GET
20% OFF!